How We Operate
Many hours are spent in careful preparation to minimize downtime and prevent interruption to regular business activities for our customers. An ounce of prevention is worth a pound of cure is our motto, and it serves to make each job run like clockwork. We coordinate our work with the schedules of other trades involved in any project we accept, and our electricians clean-up after themselves. This promotes teamwork among the trades and create positive working relationships with General Contractors and with our customers.
U.S. Army Corps of Engineers, Bridgeport,WA
Security Upgrade @ Chief Joseph Dam, Bridgeport, WA 2004
|
|
ExxonMobil – Billings, MT Multi Load Conversion Project 2009
ExxonMobil – Bozeman, MT
Fire Alarm System Change-out Billings and Spokane 2008
|
ExxonMobil – Spokane, WA
Bio-Diesel Project 2009
|
Cereal Foods Inc - Billings, MT Install power and controls for new automated flour packer
|
Cereal Foods Inc - Billings, MT New Service
|
BPB Manufacturing, Inc. - Cody, WY
Replacement of 2 Motor Control Centers and Integration of two Programmable Controllers 2004/05
|
Slumberland Furniture Store – Billings, MT
New Construction of Slumberland Furniture Store 2006
|
Starbuck’s Coffee Co. - Billings, MT
New Construction - 2007

 |
Johnson Controls, Inc.- Hardin, MT
Big Horn County Hospital MRI @ Hardin, MT 2010
Installation of peripheral Johnson Controls Equipment (Thermostats, Water Control Valves) in the Big Horn Memorial Hospital MRI Addition: Includes Labor and Misc. Material (Conduit, Fittings, Boxes, etc). Termination of main control panels by, or under the supervision of Johnson Controls.
|
Montana Dept of Transportation Energy Improvements 2010 |
Riverstone Health Clinic, Billings, MT 2010 |
|
City of Ashland, MT
Built and Installed New Controls for Ashland Lift Stn 2007
|
City Lodge Grass, MT
Lodgegrass School Coal Stoker Replacement 2007
Maintenance of the Lodge Grass Waste Water Treatment facility
|
City of Hysham, MT Maintenance and Repair for the Hysham Water Treatment Plant
|
Johnson Wilson Constructors, Inc. Complete Refurbish of Hysham Water Plant Controls 2009
|
City of Quincy, WA Quincy Water Treatment Plant 2006
|
City of Chinook, MT Chinook Waste Water Treatment Plant 2006
|
Muddy Creek, MT Modification of the complete Control System for Booster Pumps
(2) 200 hp pumps and (1) smaller pump
|
Phoenix Fabricators, Inc. Belgrade Water Tower 2008
|
UPS - Montana Change-out of Extendo Unloaders
Bozeman, MT MDC
Installed Power, Computers, Lights for Billings PAS System 2006
|
|
Park County, Montana Gardiner Lift Station 2007
|
|
COP Construction Co. McLaren Abandoned Mine Site Reclamation Project
Cooke City, MT - Work in Progress
|
|
Montana-Dakota Utilities, Co. Installation and Modification of Turbine Generators at MDUs Generation Plant at Glendive, MT
|
Montana Fish, Wildlife & Parks Cooney Dam Campground, Electrification of camper spaces 2008
|
|
| |